75°F
weather icon Clear

Here’s all of the road work in Las Vegas in the week ahead

Road work ahead

■ Lanes of Stewart Avenue will be disrupted for the expansion of the detention center between Spectrum Boulevard and Mohave Road through Monday.

■ Lanes of Rampart Boulevard will be disrupted for landscaping between Summerlin Parkway and Lake Mead Boulevard throughFriday.

■ Lanes of Decatur Boulevard will be disrupted for manhole and pipe repair south of Sahara Avenue through Saturday.

Garces Avenue will be closed at Main Street for general street improvements through April 4.

■ Lanes of Oso Blanca Drive will be disrupted for underground utility work between Durango Drive and Gilcrease Avenue through April 5.

■ Lanes of Anasazi Drive will be disrupted for landscaping between Lake Mead Boulevard and Town Center Drive through April 8.

■ Lanes of Hualapai Way will be disrupted for landscaping between Town Center and Alta drives through April 8.

■ Lanes of Lamb Boulevard will be disrupted for driveway repairs between Bonanza Road and Elm Avenue through April 8.

Wigwam Avenue will be closed at various locations between Bermuda Road and Las Vegas Boulevard through April 15 for a sewer line improvement project. Work will start at Bermuda and move west a block at a time through completion. Property accesswill be maintained throughout the project.

■ The Stephanie Street bridge over U.S. Highway 95 will be closed through mid-April for construction. Traffic will be blocked in both directions and detoured to Russell Road or Galleria Drive.

■ Lanes of Decatur Boulevard will be disrupted for pavement reconstruction between Craig and Lone Mountain roads through April 25.

■ Transit Route 109, the Maryland Parkway route, will be detoured because of road construction through April. Stops on George Crockett Road will not be served. Alternative stops are available on Routes 117 (Las Vegas Boulevard South and Silverado RanchRoad) and 217 (Warm Springs Road and downtown Henderson).

■ Lane restrictions are planned on Oakey Boulevard between Rainbow and Valley View boulevards for repaving, median andtraffic signal modifications and the installation of new traffic delineation. Vehicle lanes will be reconfigured with bicycle lanes.Traffic will be restricted to one lane in each direction from 7 a.m. to 4 p.m., Mondays through Fridays through May 21. Officials recommend Charleston Boulevard as an alternate route.

■ Lanes of Grand Teton Drive will be disrupted for median island maintenance between Durango and Buffalo drives through July16.

Sunset Road in Henderson will have periodic lane shifts and restrictions between Mountain Vista Street and Annie Oakley Drive through mid-July for major resurfacing improvements. Work will include widened bike lanes in each direction, signal improvements at Sunset and Athenian Drive and upgrades to existing sidewalk ramps and driveways. Most work will occur daily from 9 p.m. to 6a.m.

■ The ramp connecting Sunset Road to the southbound Airport Connector is closed through fall. Traffic lanes and shoulders willbe restricted on the Airport Connector between 215 Beltway and the airport tunnel through mid-2016 for the construction of aflyover lane from the southbound connector to eastbound I-215.

■ Work will continue through the summer on a 13-mile paving project on Interstate 15 north of Mesquite. The project will run from the Nevada state line to the Virgin River Gorge and include improvements to the Littlefield bridge at milepost 8. Work will occur Mondays through Fridays, 6 p.m. to 6 a.m. Work will begin on southbound lanes at the Littlefield exit.

■ Work is continuing through September on the installation of storm drains and relocating sewer lines, water lines and manholecovers, landscape removal and repairs and paving on Decatur Boulevard between Charleston Boulevard and Sahara Avenue. Sewer pipelines and manholes also will be rehabilitated on Oakey Boulevard between Rainbow and Martin L. King boulevards.

■ Work on the Regional Transportation Commission’s Flamingo Road Corridor Improvement Project will continue on the west side of Flamingo Road from Rainbow Boulevard to Hotel Rio Drive through fall.

■ Lanes of Main Street will be disrupted for general street improvements between Bonneville Avenue and Las Vegas Boulevard through Dec. 1.

■ Traffic will be disrupted for projects on Racetrack Road and the area around Heritage Park in Henderson through December. Racetrack will be resurfaced from Boulder Highway to Athens Avenue, expanded to four lanes from Boulder Highway toBurkholder Boulevard and Burkholder to Athens, adding bicycle lanes, installing a traffic signal at Blue Lantern Lane and a trafficroundabout at Newport Drive as well as a vehicular bridge over a flood channel on Newport.

■ A road widening project will delay traffic on Volunteer Boulevard from Executive Airport Drive to Las Vegas Boulevard andExecutive Airport Drive will be repaved from Volunteer to St. Rose Parkway.The project will run through February.

Gasoline prices

The average gasoline price Friday in the Las Vegas Valley was $2.41 per gallon. It was $2.40 in Nevada. The national average of$2.04 is up 6 cents from a week ago, up 32 cents from a month ago and down 39 cents from a year ago.

Las Vegas Review-Journal

Don't miss the big stories. Like us on Facebook.
THE LATEST