The Monorail Co. is still working to secure an additional $172 million to extend its 3.9-mile long track on the Strip’s east side.
mc-traffic
MOST READ
1
2
3
4
5
Vegas Loop tunnel reaches off-Strip resort
Holzhauer doesn’t go all-in, reflects on loss in ‘Jeopardy! Masters’
Restaurant closing after more than a decade on Las Vegas Strip
North Strip casino taking unlimited free parking away
‘I just hope she’s in a safe place’: More than 40 children missing in Nevada