The first of two tunnels being built by the Boring Co. for the Las Vegas Convention Center is nearing the halfway point and is on track to be complete for CES 2021.
The first of two tunnels being built by the Boring Co. for the Las Vegas Convention Center is nearing the halfway point and is on track to be complete for CES 2021.