62°F
weather icon Clear

Laying ceramic tile time-consuming, but not overwhelming

Q: I want to replace my bedroom carpet with ceramic tile, but when I pulled up a corner of the carpet, I discovered that the floor is concrete. Is this job difficult, and how much will it cost?

A: The most difficult part of this job, aside from the physical demands of lifting and setting tile while on your knees, is the layout of the tile. Ceramic tile starts at less than $1 per square foot.

The first thing to do is remove the carpet, the tack strip, and all the nails that hold the tack strip to the slab. Next, remove the dirt from the slab.

When you remove the carpet, leave about 4 inches of carpet coming into the bedroom. Fold it under so no one trips on it. You’ll use this as a transition to the new tile at the end of the job.

Laying out the tile is the most important part of the job. Your goal is to arrive at a starting point that doesn’t leave you with thin pieces of tile around the perimeter of the room.

Snap a chalk line down the center of the room, then snap a second line to run perpendicular to the first line from the adjacent wall. Use a framing square to make sure the lines are square. Lay out the tiles with tile spacers along these lines. You’ll probably have to move one or both chalk lines so you don’t have slivers of tile around the room.

You’ll also need a wet saw if you want professional-looking results. A cheapie costs around $100 or you can rent one for about $40 a day. If you only have a few tiles to cut, you can take them to a home center where they typically charge 50 cents per cut.

Mix up a batch of thin-set mortar, which costs about $8 a bag, but is enough to cover about 90 square feet using a trowel with ¼-inch teeth. Don’t mix more than you can use in an hour, because after that it tends to clump.

When you snapped the chalk lines, you divided the room into quadrants. Start in one quadrant and complete it before moving on to another one. It’s best to start in the quadrant farthest from the door to avoid tiling yourself into a corner.

Spread the mortar using the trowel. Start in the quadrant at the intersection of the chalk lines and work your way back, holding the trowel at a slight angle to spread the mortar. Get it close to the lines, but don’t cover them.

I usually do several rows at a time depending upon the size of the room, head back to the wall, make any cuts with the wet saw then move on to the next row. Leave yourself enough room to make any needed cuts for the corners, then back out of the quadrant.

Set each tile into the mortar with a slight twisting motion as you press down. Keep the tile’s edges aligned with the chalk lines, inserting spacers as you go. Remove the spacers after the tiles have had time to firm up and while you can still reach them without disturbing the tiles. There will be some mortar that squeezes out between the tiles (where the grout will go). This is normal, but don’t let the squeeze-out build up too much or it will rise higher than the surface of the tile, which will affect the grout. I usually keep a sponge and paper towels on hand to scoop out excess mortar while it’s still wet.

Once the tile is down, wait at least 24 hours before you grout. The floor will look pretty bad with just the tile down, but the grout will pull it all together.

Before I grout, I put painter’s tape on the baseboards at the height of the tile. After I grout and before it has had a chance to completely harden, I slowly pull the tape off the baseboards. It leaves a crisp grout line with no smudges. To grout, you’ll need a grout float (a piece of rubber attached to a handle), bucket of water, large sponge and dry white rag. Mix the grout, then use the grout float to push it into the spaces between the tiles. Keep the face of the float at an angle and pull it diagonally across the face of the tiles filling every nook and cranny. Wring out the sponge in clean water and wipe up the excess grout.

About 15 minutes after you sponge off the grout, you’ll notice a haze forming on the tile. Use the rag to buff it off. You should do this promptly.

You can buy a transition strip for the entry to your bedroom, or you can use that extra bit of carpet you had left from the hallway. Hammer down some tack strip, stretch the carpet over it then trim the carpet to size.

Mike Klimek is a licensed contractor and owner of Las Vegas Handyman. Questions may be sent by email to: handymanoflasvegas@msn.com. Or, mail to: 4710 W. Dewey Drive, No. 100, Las Vegas, NV 89118. His Web address is www.handymanoflasvegas.com.

Don't miss the big stories. Like us on Facebook.
THE LATEST
Some petunia varieties can stand up to our summer heat

There are lots of different kinds of petunias. For instance, the Madness Summer Series can take the heat, but petunias typically are not known for that.

Watch out for hornworms lurking in your garden

Anyone who has been gardening for a while has a horror story or two about hornworms, which infest many vegetables in the tomato family.

What can be done about high boron levels in soil?

Boron is one of the salts commonly found in desert soils. It can be present naturally or it can accumulate over the years in such places as horse corrals.