How fans get into and out of the vicinity of a planned Las Vegas ballpark is a key detail that still needs to be hammered out ahead of the team’s arrival on the Strip in 2028.
Search results for:
Road closures surrounding Allegiant Stadium are expected to increase as Super Bowl week approaches.
State officials are looking to ease traffic congestion around a major resort corridor road project.
Installation of the massive 760-foot bridge Flamingo Road bridge over Koval Lane was completed last week.
To help their efforts, extra resources have been made available for the ongoing Interstate 15/Tropicana Avenue project.
One of the most disruptive of the road closures tied to the Las Vegas Grand Prix circuit setup is scheduled to begin this week.
Some of the temporary structures set to be built to ensure essential traffic can travel in and out of the Las Vegas Grand Prix footprint will be a feat upon itself.
A traffic study lays out recommendations for how to increase travel in the area surrounding the Tropicana site.
Once the ongoing paving operation — the one causing havoc on the Strip in recent weeks — that is readying the Las Vegas Grand Prix circuit is complete, another major repave is not expected to be necessary for years.
The Athletics decision to switch their preferred ballpark site to the Tropicana property will bring more than a team to the south Strip. It will also bring traffic.